Name
Federal data center siting and pilot bills
Jurisdiction
United States — federal
Instrument type
Proposed legislation
Bill / legal citation
H.R. 9939, S. 5658, H.R. 11002, H.R. 10976 and H.R. 10972.[1][2][3][4][5]
Legislative or adoption status
Introduced and referred to committees.[1][2][3][4][5]
Effective dates
None. The measures are proposals.
Last source verification
November 17, 2026 — introduced bill texts and committee referrals reviewed.[1][2][3][6][4][5]

Members of the 119th Congress introduced separate proposals governing data-center construction and operation on federal lands, conditions on federal spending and a Defense Department orbital-data-center pilot.

Federal land and data-center construction

Senator Ron Wyden introduced S. 5658 on September 30, 2026. The Senate read it twice and referred it to the Committee on Energy and Natural Resources. Representative Maxine Dexter introduced H.R. 11002, the Protecting Our Public Lands from Data Centers Act of 2026, on November 11. The House referred it to Natural Resources and Agriculture. The official House action record also lists introductory remarks on November 12.[2][3][6]

Both bills would prohibit construction on National Forest System land and land managed by the Secretary of the Interior, excluding specified Tribal lands. Both would require future conveyances of covered federal land to provide for reversion to the United States if the land is used for a data center without specific congressional authorization. The House version expressly includes lands taken into trust after enactment in its Tribal-land exclusions.[2][3] A related Senate amendment, S.Amdt. 6971, was submitted separately in the permitting debate.[7]

No AI Data Centers on Federal Lands Act

Representative Rashida Tlaib introduced H.R. 9939 on July 23, 2026. The House referred it that day to the Committee on Natural Resources. It would prohibit construction or operation of covered AI data centers and associated infrastructure on federally owned or managed land, including Defense Department land. It excludes land held in trust for a Tribe or Tribal member.[1][8]

The definition covers qualifying facilities used for AI development or operation at scale. It also reaches facilities above 20 MW of rated capacity or peak load if they can supply at least 20 kW to one rack or use specified forms of liquid cooling. Agencies that operate, lease, have built or are building covered facilities would have 30 days after enactment to stop or order a halt to construction or operations and begin or order removal. Removal would have to comply with federal cleanup law and other applicable law.[8]

Federal funding and state or local approvals

H.R. 10976, the Community Control of Data Centers Act, would make federal funding for construction or operation contingent on compliance with applicable state and local laws, including any required approvals. The Secretary of Energy would make that determination in consultation with the Secretary of the Treasury. The bill was introduced November 10, 2026, and referred to House Energy and Commerce.[4]

Defense Department orbital-data-center pilot

H.R. 10972, the NEW HORIZON Act, would direct the Defense Department, through the Defense Innovation Unit, to run a commercial orbital-data-center pilot under the Hybrid Space Architecture initiative within one year of enactment. The bill was introduced November 10, 2026, and referred to House Armed Services.[5]

References